Capability

Quality Control & Testing

Quality control and testing across an order: incoming material and components, key production processes and finished goods, plus the first article inspection of a new mold and the leak, insulation, drop and material / composition checks that apply to the product.

Execution model

In-house

Capability group

Quality & Testing

Quality Control & Testing — Icoflask

Boundaries

Attributes

  • Defect Classes — Critical / Major / Minor
  • AQL — Finished goods generally by sampling / AQL, key items can be 100% inspected
  • Standard Priority — Customer AQL / quality standard applies when specified in advance, otherwise the factory standard
  • FAI Trigger — New mold first production run
  • FAI Trigger-based — Major mold repair, key tooling / fixture change, key process change, or another major change affecting the result
  • FAI on Repeat Orders — No mechanical full FAI
  • Leak Test — Applied at suitable points such as after polishing
  • Insulation Test — Applied after vacuum and after coating / painting, may be run twice
  • Drop Test — Only when the customer requires it, not mandatory on every order
  • Material / Composition Verification — Arranged according to material, customer and compliance requirements
  • Customer-specific Testing — Standard, sample source, cost and timing agreed per project
  • Failure Cost — Allocated by root cause / responsibility

Process

How this capability runs.

1

Incoming QC

Stainless steel raw material, purchased tubing, lid / accessories, colour, printing, packaging, supplier documents, necessary material evidence

The Incoming QC step of this capability
2

Process QC

Checks at key processes; on a trend deviation: production hold if needed, containment from the last known good point, root cause, corrective action, reinspection, resume

The Process QC step of this capability
3

First Article Inspection

New mold first production run, and trigger-based occasions: checked against drawing, final specification, function, appearance and the approved / golden sample; on a fail, stop or contain, root cause, corrective action, new first article, reinspection, resume

The First Article Inspection step of this capability
4

Testing

Leak, insulation and drop (when requested) at the production points where they apply, plus material / composition verification per requirement

The Testing step of this capability
5

Finished Goods QC

Appearance, functionality, safety / applicable tests, sampling / AQL

The Finished Goods QC step of this capability

Evidence

Photos from this process.

Leak Test
Leak Test
Insulation Test
Insulation Test
Drop Test
Drop Test
Dimensional Check
Dimensional Check
Finished Appearance Inspection
Finished Appearance Inspection
Finished Goods Sampling Inspection
Finished Goods Sampling Inspection

Applications

Applications that used this capability.

Request a quote

Send the requirement.

The product or reference model, the quantity and the change you need are enough — the requirement is reviewed before it is quoted.

We use these details only to answer your enquiry — see our Privacy Policy.

Chat with us on WhatsApp