Capability

Stainless Steel Drinkware Production

Two production lines manufacture the stainless steel drinkware body in-house, with partner-managed operations for part of the work; reference daily capacity about 10,000-15,000 pcs.

Execution model

Hybrid

Capability group

Manufacturing

Stainless Steel Drinkware Production — Icoflask

Boundaries

Attributes

  • Production Lines — 2
  • Reference Daily Capacity — about 10,000-15,000 pcs
  • In-house Share — about 80-85% (company-wide)
  • Outsourced Share — about 15-20% (e.g. some lids, accessories, packaging/carton, electrolytic, spray painting/coating)
  • Typical Bulk Order — 3,000-5,000 pcs
  • Reference Lead Time — about 30 days, always subject to production confirmation after the order is production-ready
  • Capacity Commitment — Customer forecast is for planning only, not a firm order or production authorisation

Process

How this capability runs.

1

Planning

Order and specification confirmed

The Planning step of this capability
2

In-house production

Body manufacturing on the two lines

The In-house production step of this capability
3

Partner operations

Outsourced / purchased steps with incoming QC and batch traceability

The Partner operations step of this capability
4

Finished goods

Handed to QC

The Finished goods step of this capability

Evidence

Photos from this process.

automatic production line
automatic production line
Forming
Forming
cutting of pipe
cutting of pipe
Polishing
Polishing
laser engraved
laser engraved
Incoming QC / batch
Incoming QC / batch

Products

Products built on this capability.

See all products

Applications

Applications that used this capability.

Request a quote

Send the requirement.

The product or reference model, the quantity and the change you need are enough — the requirement is reviewed before it is quoted.

We use these details only to answer your enquiry — see our Privacy Policy.

Chat with us on WhatsApp